After final assembly has occurred, the build may be finalized. At this stage, all reserved inventory units are consumed and final adjustments are made to inventory. A quantity of the finished good may optionally be added to inventory as a resulting transaction. A permanent record of the inventory consumption is maintained for record-keeping purposes.
Finished Goods Cost
Aligni computes the cost basis for each part produced by a build by summing the total material costs with the total non-material costs, then dividing by the quantity produced.
Material Parts
The cost for material parts is not entered during the build process. Instead, it is automatically determined by the cost of inventory units that are reserved during the reserve step. These costs carry over to the finished goods cost.
Non-Material Parts
Non-Material parts such as labor, test processes, or other non-inventoried items can be part of a bill of materials, as well. These items can contribute to the overall cost of production, but are not accounted for in inventory. To accurately reflect their cost in the production of finished goods, they are accounted for during the commit stage.
Here, you can enter a price paid for such items or you can select from quotes already in your database using the Price Helper. The cost of these items is extended and included in the total build cost.
Recorded Cost
Aligni records the final cost of the build as a single number in the site currency. You can select to record this as the estimated cost of the build part (the number stored as a part parameter) or the total of the non-material and material costs on the build. You can also choose to enter the cost manually.
Inventory Status
Inventory counts for the consumed items are updated during the build commit process. These changes are made according to the quantities entered at the reservation stage.
Once the build is committed, references to the build on the part inventory summaries are removed and just the updated part counts remain.
Finished Goods Inventory
If selected, the assembly part is added to inventory with the corresponding cost as selected. Recent completed builds are displayed in the inventory summary on the part details page for the assembly part.
Build Review
After completion, a permanent record of the consumption remains for review. The dates on which the build was created, allocated, reserved, and committed are stored as well as the quantity and the total build cost for each unit.
Finally, each inventory change is individually stored as well as that part’s contribution to the total build cost.
Part Usage History
Completed builds maintain a persistent record of inventory consumption for the individual parts on the build bill of materials. These records serve as historical part usage information that can be viewed on the part details page in the Part Usage box. Historical, in-progress, and future usage is charted on the Supply Chain tab.